Detailed planning and inventory optimization model in the mattress industry
- Autores
- Montagna, Jorge Marcelo; Cecchietti, Aldo; Rodríguez, María Analía; Corsano, Gabriela
- Año de publicación
- 2015
- Idioma
- inglés
- Tipo de recurso
- documento de conferencia
- Estado
- versión aceptada
- Descripción
- In this work, a mixed integer linear programming (MILP) model for the simultaneous production and inventory planning problems is proposed, which arise in the industrial context of polyurethane foam manufactory. The production process considers the foam blooming stage as well as the curing step where the blocks are dried. Several tradeoffs are involved in the overall model given that detailed inventory management decisions are also taken into account in the formulation. Several study cases provided by a local company are tested to show the model performance.
VIII CAIQ 2015 AAIQ Buenos Aires y 3 JASP
Fil: IDTQ-PLAPIQUI (CONICET-UNC), Av. Vélez Sarsfield 1611, Ciudad Universitaria, X5016GCA, Córdoba, Argentina
Fil: INGAR (CONICET-UTN), Avellaneda 3657, Santa Fe 3000, Argentina
Peer Reviewed - Materia
-
Production planning
Inventory management
Polyurethane foam
MILP - Nivel de accesibilidad
- acceso abierto
- Condiciones de uso
- 2018-09-10T17:46:10Z
- Repositorio
.jpg)
- Institución
- Universidad Tecnológica Nacional
- OAI Identificador
- oai:ria.utn.edu.ar:20.500.12272/3101
Ver los metadatos del registro completo
| id |
RIAUTN_a690f7075891e68aebb48396fd4b0a38 |
|---|---|
| oai_identifier_str |
oai:ria.utn.edu.ar:20.500.12272/3101 |
| network_acronym_str |
RIAUTN |
| repository_id_str |
a |
| network_name_str |
Repositorio Institucional Abierto (UTN) |
| spelling |
Detailed planning and inventory optimization model in the mattress industryMontagna, Jorge MarceloCecchietti, AldoRodríguez, María AnalíaCorsano, GabrielaProduction planningInventory managementPolyurethane foamMILPIn this work, a mixed integer linear programming (MILP) model for the simultaneous production and inventory planning problems is proposed, which arise in the industrial context of polyurethane foam manufactory. The production process considers the foam blooming stage as well as the curing step where the blocks are dried. Several tradeoffs are involved in the overall model given that detailed inventory management decisions are also taken into account in the formulation. Several study cases provided by a local company are tested to show the model performance.VIII CAIQ 2015 AAIQ Buenos Aires y 3 JASPFil: IDTQ-PLAPIQUI (CONICET-UNC), Av. Vélez Sarsfield 1611, Ciudad Universitaria, X5016GCA, Córdoba, ArgentinaFil: INGAR (CONICET-UTN), Avellaneda 3657, Santa Fe 3000, ArgentinaPeer Reviewed2018-09-10T17:46:10Z2018-09-10T17:46:10Z2015info:eu-repo/semantics/conferenceObjectinfo:eu-repo/semantics/acceptedVersiondocunento de conferenciahttp://purl.org/coar/resource_type/c_5794info:ar-repo/semantics/documentoDeConferenciaapplication/pdfapplication/pdfhttp://hdl.handle.net/20.500.12272/3101eng“Integración de sistemas soporte de decisión para la gestión optima de la cadena de suministros utilizando sistemas empresariales” Código:25/0152Fumero, Y.; Corsano, G.; Montagna, J. M. (2011). Planning and Scheduling of Multistage Multiproduct Batch Plants Operating under Production Campaigns. Ann. Oper. Res., 199, 249–268.Fumero, Y.; Corsano, G.; Montagna, J. M. (2013). Integrated Modeling Framework for Supply Chain Design Considering Multiproduct Production Facilities. Ind. Eng. Chem. Res., 52, 16247–16266.Grossmann, I. E. (2012). Advances in Mathematical Programming Models for Enterprise-Wide Optimization. Comput. Chem. Eng., 47, 2–18.Lin, B. M. T.; Lin, Y.-Y.; Fang, K.-T. (2013). Two-Machine Flow Shop Scheduling of Polyurethane Foam Production. Int. J. Prod. Econ., 141, 286–294.Maravelias, C. T.; Sung, C. (2009). Integration of Production Planning and Scheduling: Overview, Challenges and Opportunities. Comput. Chem. Eng., 33, 1919–1930.Marchetti, P. A.; Gupta, V.; Grossmann, I. E.; Cook, L.; Valton, P.-M.; Singh, T.; Li, T.; André, J. (2014). Simultaneous Production and Distribution of Industrial Gas Supply-Chains. Comput. Chem. Eng., 69, 39–58.Mogaji, P. B. A (2014). Decision Support System for Process Planning and Control of Polyurethane Foam Production http://www.scitechnol.com/a-decision-support-system-for-process-planning-and-control-of-polyurethane-foam-production-fd2A.pdf (accessed Aug 20, 2014).Relvas, S.; Boschetto Magatão, S. N.; Barbosa-Póvoa, A. P. F. D.; Neves, F. (2013). Integrated Scheduling and Inventory Management of an Oil Products Distribution System. Omega, 41, 955–968.Rodriguez, M. A.; Vecchietti, A. (2010). Inventory and Delivery Optimization under Seasonal Demand in the Supply Chain. Comput. Chem. Eng., 34, 1705–1718Rosenthal, R.E. (2013). GAMS- A User's Guide. GAMS Development Corporation, Washington, DC, USA.info:eu-repo/semantics/openAccess2018-09-10T17:46:10Zhttp://creativecommons.org/publicdomain/zero/1.0/autorizo la publicación de la obra desde su aprobación/presentaciónCC0 1.0 Universalreponame:Repositorio Institucional Abierto (UTN)instname:Universidad Tecnológica Nacional2026-09-24T12:45:57Zoai:ria.utn.edu.ar:20.500.12272/3101instacron:UTNInstitucionalhttp://ria.utn.edu.ar/Universidad públicaNo correspondehttp://ria.utn.edu.ar/oaigestionria@rec.utn.edu.ar; fsuarez@rec.utn.edu.arArgentinaNo correspondeNo correspondeNo correspondeopendoar:a2026-09-24 12:45:57.728Repositorio Institucional Abierto (UTN) - Universidad Tecnológica Nacionalfalse |
| dc.title.none.fl_str_mv |
Detailed planning and inventory optimization model in the mattress industry |
| title |
Detailed planning and inventory optimization model in the mattress industry |
| spellingShingle |
Detailed planning and inventory optimization model in the mattress industry Montagna, Jorge Marcelo Production planning Inventory management Polyurethane foam MILP |
| title_short |
Detailed planning and inventory optimization model in the mattress industry |
| title_full |
Detailed planning and inventory optimization model in the mattress industry |
| title_fullStr |
Detailed planning and inventory optimization model in the mattress industry |
| title_full_unstemmed |
Detailed planning and inventory optimization model in the mattress industry |
| title_sort |
Detailed planning and inventory optimization model in the mattress industry |
| dc.creator.none.fl_str_mv |
Montagna, Jorge Marcelo Cecchietti, Aldo Rodríguez, María Analía Corsano, Gabriela |
| author |
Montagna, Jorge Marcelo |
| author_facet |
Montagna, Jorge Marcelo Cecchietti, Aldo Rodríguez, María Analía Corsano, Gabriela |
| author_role |
author |
| author2 |
Cecchietti, Aldo Rodríguez, María Analía Corsano, Gabriela |
| author2_role |
author author author |
| dc.subject.none.fl_str_mv |
Production planning Inventory management Polyurethane foam MILP |
| topic |
Production planning Inventory management Polyurethane foam MILP |
| dc.description.none.fl_txt_mv |
In this work, a mixed integer linear programming (MILP) model for the simultaneous production and inventory planning problems is proposed, which arise in the industrial context of polyurethane foam manufactory. The production process considers the foam blooming stage as well as the curing step where the blocks are dried. Several tradeoffs are involved in the overall model given that detailed inventory management decisions are also taken into account in the formulation. Several study cases provided by a local company are tested to show the model performance. VIII CAIQ 2015 AAIQ Buenos Aires y 3 JASP Fil: IDTQ-PLAPIQUI (CONICET-UNC), Av. Vélez Sarsfield 1611, Ciudad Universitaria, X5016GCA, Córdoba, Argentina Fil: INGAR (CONICET-UTN), Avellaneda 3657, Santa Fe 3000, Argentina Peer Reviewed |
| description |
In this work, a mixed integer linear programming (MILP) model for the simultaneous production and inventory planning problems is proposed, which arise in the industrial context of polyurethane foam manufactory. The production process considers the foam blooming stage as well as the curing step where the blocks are dried. Several tradeoffs are involved in the overall model given that detailed inventory management decisions are also taken into account in the formulation. Several study cases provided by a local company are tested to show the model performance. |
| publishDate |
2015 |
| dc.date.none.fl_str_mv |
2015 2018-09-10T17:46:10Z 2018-09-10T17:46:10Z |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/conferenceObject info:eu-repo/semantics/acceptedVersion docunento de conferencia http://purl.org/coar/resource_type/c_5794 info:ar-repo/semantics/documentoDeConferencia |
| format |
conferenceObject |
| status_str |
acceptedVersion |
| dc.identifier.none.fl_str_mv |
http://hdl.handle.net/20.500.12272/3101 |
| url |
http://hdl.handle.net/20.500.12272/3101 |
| dc.language.none.fl_str_mv |
eng |
| language |
eng |
| dc.relation.none.fl_str_mv |
“Integración de sistemas soporte de decisión para la gestión optima de la cadena de suministros utilizando sistemas empresariales” Código:25/0152 Fumero, Y.; Corsano, G.; Montagna, J. M. (2011). Planning and Scheduling of Multistage Multiproduct Batch Plants Operating under Production Campaigns. Ann. Oper. Res., 199, 249–268. Fumero, Y.; Corsano, G.; Montagna, J. M. (2013). Integrated Modeling Framework for Supply Chain Design Considering Multiproduct Production Facilities. Ind. Eng. Chem. Res., 52, 16247–16266. Grossmann, I. E. (2012). Advances in Mathematical Programming Models for Enterprise-Wide Optimization. Comput. Chem. Eng., 47, 2–18. Lin, B. M. T.; Lin, Y.-Y.; Fang, K.-T. (2013). Two-Machine Flow Shop Scheduling of Polyurethane Foam Production. Int. J. Prod. Econ., 141, 286–294. Maravelias, C. T.; Sung, C. (2009). Integration of Production Planning and Scheduling: Overview, Challenges and Opportunities. Comput. Chem. Eng., 33, 1919–1930. Marchetti, P. A.; Gupta, V.; Grossmann, I. E.; Cook, L.; Valton, P.-M.; Singh, T.; Li, T.; André, J. (2014). Simultaneous Production and Distribution of Industrial Gas Supply-Chains. Comput. Chem. Eng., 69, 39–58. Mogaji, P. B. A (2014). Decision Support System for Process Planning and Control of Polyurethane Foam Production http://www.scitechnol.com/a-decision-support-system-for-process-planning-and-control-of-polyurethane-foam-production-fd2A.pdf (accessed Aug 20, 2014). Relvas, S.; Boschetto Magatão, S. N.; Barbosa-Póvoa, A. P. F. D.; Neves, F. (2013). Integrated Scheduling and Inventory Management of an Oil Products Distribution System. Omega, 41, 955–968. Rodriguez, M. A.; Vecchietti, A. (2010). Inventory and Delivery Optimization under Seasonal Demand in the Supply Chain. Comput. Chem. Eng., 34, 1705–1718 Rosenthal, R.E. (2013). GAMS- A User's Guide. GAMS Development Corporation, Washington, DC, USA. |
| dc.rights.none.fl_str_mv |
info:eu-repo/semantics/openAccess 2018-09-10T17:46:10Z http://creativecommons.org/publicdomain/zero/1.0/ autorizo la publicación de la obra desde su aprobación/presentación CC0 1.0 Universal |
| eu_rights_str_mv |
openAccess |
| rights_invalid_str_mv |
2018-09-10T17:46:10Z http://creativecommons.org/publicdomain/zero/1.0/ autorizo la publicación de la obra desde su aprobación/presentación CC0 1.0 Universal |
| dc.format.none.fl_str_mv |
application/pdf application/pdf |
| dc.source.none.fl_str_mv |
reponame:Repositorio Institucional Abierto (UTN) instname:Universidad Tecnológica Nacional |
| reponame_str |
Repositorio Institucional Abierto (UTN) |
| collection |
Repositorio Institucional Abierto (UTN) |
| instname_str |
Universidad Tecnológica Nacional |
| repository.name.fl_str_mv |
Repositorio Institucional Abierto (UTN) - Universidad Tecnológica Nacional |
| repository.mail.fl_str_mv |
gestionria@rec.utn.edu.ar; fsuarez@rec.utn.edu.ar |
| _version_ |
1877230912343638016 |
| score |
13.265058 |